Transcript 0:00 Righto, buddy miners. I called, I picked up the phone yesterday, called Access Miner Technology, spoke to a guru. 0:07 I told ya, I've been telling everyone, you pick up the ph- you call 'em, there's someone on the line that knows exactly what they're talking about. 0:15 The trusted advisor in drill or survey instrumentation They're the companies we operate with, mate Only companies, JD. Mate, so what do we got today? We've got bit of Adriatic, bit of Liontown. 0:27 Liontown first spot con- Yeah... apparently. Yeah. 0:30 A- and they're two companies that are, you know, going along that curve of bringing a, a mine online as, and as a s- as a single asset kinda developer, and, um, pretty critical kind of, you know, point in their life cycles for both of them. 0:40 Mm. And is the consolidation of the sandstone finally here? Mm. Is it? Maybe. Maybe. Junior gold M&A, mate. Something is coming to fruition maybe. We're gonna get into it. There is a deal. Very excited, mate. 0:57 Ah, what have you got? Bloody bit of iron ore. Champion Iron. They fly u- fly under the radar, but they make a bit of money, and they're at that- Yeah... sort of premium end of the, the iron ore production spectrum. 1:06 So I think they're gonna get more and more attention over time. Champion Iron Ore, also known as Champ Iron Ore, Trav. Just like you, mate. [laughs] Take it away. Lead her away, Champ. Oh, jeez. 1:18 [laughs] Carl, Kalgoorlie boy, what have you got? Oof. Best calm myself down. [laughter] Um, all right. So A- Adriatic, we'll start there, right? 1:25 Because Adriatic Metals, it's, it's really, really interesting to me at the moment, gents. 1:28 They're, they're of course ramping up their Vares, uh, silver, zinc, lead polymetallic deposit in Bosnia, and it's a project and company we've talked about a lot, in part because it's, you know, stonking grade, and in part because, you know, they're at the part of that Lassonde Curve we get so interested in. 1:43 Like Bellevue, like Liontown. 1:45 Um, and in the case of Adriatic, they, they put out their quarterly yesterday and I was, I was pretty interested in it because Adriatic c- um, like if you think of the NPV of an undeveloped project, you know, your, um, NPV before you start construction is a bit, and then as you, as you sink the CapEx, you kind of, you hit maximum NPV, ri- Mm... 2:02 like kind of r- you know, right before the kind of cash flows start coming in. 2:05 Um, and so like in theory, they, they should kind of be at maximum NPV right now, just from a, you know, f- a financial model perspective of the, of their, of their asset. Um, and- As they start depleting. Exactly right. 2:17 Yeah. The CapEx is sunk now. Um, you know, production's kind of ramping up, going through commissioning. You know, you're almost about to start stoping and all that sort of stuff, so. 2:25 And yet their share price is down 35% in basically six weeks, which j- just gets me really intrigued, right? Because some- something, something's happening there. 2:33 The market's pricing in more risk than, you know, a valuation model should be doing. Yeah. And the short interest has risen too. So the short interest is up, um, from 0.5% to 2.7% on the spark chart. 2:44 It suggests to me that the market's nervous, right? And that's, that's... You know, sometimes we see this sort of stuff happen. Sometimes the market's right, sometimes it's not. 2:52 But we, when it happens in ramp up, you know, it just, it's always, it's always worth digging. Um, and the, there's a few things to hone in on with the quarterly, I think. 3:01 Remember they raised US 50 million bucks, um, in the quarter, last quarter as a, as a bit of a buffer there. Um, but look, look, looking first at the, at the cash flows, 3:12 operating cash flow for the quarter just gone was negative, uh, US 11 million. Investing cash flows negative US 23 million. So a bit bleak on the, on the cash front if it wasn't for the, for the equity raise. 3:22 And so they're having like a slower ramp up than some expectations were, and they've got 143 million in drawn debt as well. 3:29 So there's a few, I think a few separate talking points on, on the company's, you know, cash position, change in cash that might be kind of hindering, um, ramp up expectations and that's kind of flowing through into the, into the market so far. 3:42 Now I think, I think if you surmised it, like between the development of the... It was pretty, um, pretty disclosed about the poor, the poorer than expected ground conditions in the capital- Yep... 3:54 got better to the ore and a lot of the intense ground support and set- sets they had to put in for that. And then recently, which would probably go into the, the query around the- Mm... 4:05 was it the la- the title for the land for the TSF and- Yeah... everything. I will get... Yeah, exactly. Yeah. There's, there's a bit of it. So there's a bit going on. There is, yeah. 4:13 And y- the first one, you're totally, you know, right, and we've talked about a fair bit, and that's development rates. Um, these are, they're actually improving. 4:20 They've been a sticking point, um, for Adriatic, but they're kind of up to, up 32% quarter on quarter. They're now doing 262 meters per jumbo per quarter. But, um, the DFS kind of had 600 meters per jumbo per quarter. 4:32 Like you said though, the, the, the tough stuff is in the development kind of, um- Yeah... area. In the capital. And the- Yeah... and they're, like, they actually haven't start- started stoping yet. 4:42 So, and that's, that's the other point on cashflow too, right? They, it's all been development ore so far. So- Mm... you know, stoping commences in August pending final permitting. 4:50 Um, so y- you know, as a result of that, e- even though this is an underwhelming quarter, Adriatic, they're maintaining that nameplate is actually gonna be reached by Q4- Yeah... this year as a result of that. 5:00 And they, they also had the mining going under operator as well. 'Cause they had the lo- I think the- Yep... the, building the relationship with Bosnia. Yeah. Um, so they had the local mining contractor I think. 5:10 Now they've gone under operator, I think logistically getting things there is obv- it would be a bit challenging as well to- Tough... to Bosnia- Yeah... like the supply chain. 5:18 So I think a lot of, a lot of teething issues just on the mining services and the supply- Mate, it's a-... to that joint as well... it's a amazing, like... 5:28 You could create a huge list of the o- you know, obstacles that come your way when you're bringing a new mine online, and especially a new mine online in a jurisdiction [chuckles] that doesn't have a lot of mining. 5:38 [laughs] Um. Yeah. You took the words- Offset by the grade. Yes Exactly. Yeah. You took the words out of my mouth. 5:42 That owner operator, they had to buy the contract out, so that cost them a bit of, a bit of cash up front as well- Mm... and a bit more down the line. 5:49 The third point, um-You know, it's, it's one, it's kind of hard to get a, a proper read on, or at least I didn't do enough work, um, in the, in the short time we, we had this morning before recording the episode, Mattie. 5:58 But well, it's just on recoveries, so they don't actually tabulate the achieved recoveries or, you know, payabilities with their... They've got, they produce two concentrates. 6:06 Um, you know, it's a, a zinc con and then a silver lead con, but they don't, um, they don't, there's not like a, you know, they don't tabulate what the recov- recoveries are so far. 6:13 But there is this commentary that metal recovery rates are improving consistently, and the processing team is working on delivering further enhancements and optimization of the plant. 6:24 So naturally, I think there is some digging worth doing on recoveries because that's a sentence you kind of include when current recoveries are probably below your expectations and you wanna assure the market- Mm... 6:34 that they're getting better. Um, and to be clear, you know, I don't think you'd be expecting the plant to, um, you know, to be bloody, you know, h- h- you know, humming straight away. 6:43 You are improving things during this commissioning phase. It's not like you just expect it to be bloody amazing straight out the gate, but- And, and development ore, remember as well, is always- Exactly... 6:51 a lower grade- Exactly right... than the stoping ore. 100% right. I, I think. Yes. I think. I'm not sure of the width of their ore body. That's specifically what they talk about too, right? Yeah. Yeah. 6:59 Um, you know, the, the, the, the, the fact that the, you know, the stoping ore's gonna be going in lifts your, you know, the, the grade profile, and then as a result of lifting the grade profile, your recoveries should lift- Yeah... 7:09 too. Um, which we, we've fucking learned. I'll fall all over it. [laughs] Yeah. But I do, I do still wonder... 7:15 Like, they, they do say that the concentrate they produced is saleable, which is good, but I do wonder if there's like, you know, h- what are the expectations versus realities so far, you know, even kinda grade adjusted? 7:24 How are things going on the deleterious elements? How are things going on the penalties, the payabilities, you know, the recoveries given the development ore and all that sort of stuff? 7:31 Like, how are those actually kinda matching, um, the, you know, the estimations? I'd, I'd, I'd be really curious to, to get more information on that. And like, they did. 7:41 They, they chucked in a bunch of what their assumptions were in the DFS, and we can kind of flash them up. 7:45 Um, but I'd be, yeah, curious to just learn over time how those assumptions are kinda tracking with, um, with the, you know, the actual data that they're seeing come out of the plant and everything so far. 7:55 Yeah, and pure, pure development ore as well. I assume hopefully they've got a good magnet, 'cause you throw on every bit of ore's got bolts and mesh in it- [laughs]... as well 'cause it's all the development ore. Yeah. 8:04 So more concentrated amounts of steel that you gotta get out and- Yeah... and b- getting the, I guess, the plant flowing would be a lot more difficult with that. Yeah. You know, from my metallurgy days. 8:15 [laughs] So, but they're all pretty, pretty, um, serious but standard risks to the cashflow in this crucial period, but there's also a bunch of other risks. Mattie, you sort of raised one in, in your digging. 8:27 What else did you, you come up with? Yeah, that's like... There, these are... Th- you know, you, you look at that share price down 35%. I think there's like two things to talk about there. 8:36 One is there's been some media about, um, you know, the Constitutional Court of Bosnia ruling on the 11th of July, which looks to complicate some of Adriatic's plans at a minimum. 8:46 Um, this ruling impacts their planned extended tailing storage facility, basically suggests, um, that removal of state forest is uncon- constitutional. 8:54 Adriatic are currently, you know, using a temporary TSF which has capacity until first quarter 2025. That's not very far away, right? Especially if they only kind of hit nameplate in Q4. So sort of, um, yeah. 9:06 So not, not far away. 9:08 Um, they're working on alternatives which could be on freehold property owned by Adriatic instead, so hopefully they can, you know, resolve this and, and have, you know, permitting to, to use an alternative kind of, you know, promptly. 9:18 But there's, there's risk of sort of, you know, interrupted, um, production if, if you can't resolve that in, in, in the time that you need to. 9:24 H- I, I found this photo of the proposed, um, dry stack TSF from the DFS, which I think is the one that they now need an alternative for. Um, and yeah. 9:35 So l- l- let's just hope that that can be resolved and that the, you know, the worst case scenario is, um, you know, is not as, as, as bad as might be, be priced in. 9:44 But another example of something you're probably not expecting when you're ramping up a new mine- The-... is for the bloody, the constitutional court to say that, yeah, part of your plans are unconstitutional. 9:54 [laughs] Mm. So you're saying that the dry stacked... So that wasn't there, but now that might have to be there? No, that was in the DFS. 10:01 I think that's what the plans of what, what it was supposed to be was- What it's supposed to be, yeah... yeah. Um- Yeah... k- keep in mind, it's like a bloody, you know, mountain and everything, so. 10:09 Um, and then there's this, the other, the other risk I think too is of just reading the quarterly. There's a sentence in the quarterly too regarding potential expansion of the mill. 10:17 It says Asino's commenced studies to increase plant throughput, um, up to 1.3 million tons per annum. Asc- Ascenco. Ascenco. Ascenco. Sorry. 10:25 [laughs] With a detailed report expected in, in Q3, uh, this would align with increased mine production following the extension of the ore reserve at, uh, Ripas Northwest. So in the back of my mind- [laughs] 10:36 You know what I'm thinking? Yeah. Jeez, obviously it's like I saw that the other week. Yeah. [laughs] Exactly. And maybe this is part of it too, right? Like, we're just... Yeah. 10:45 I, I mean, back of my mind, I use the conversation we had with Nathan Soytis where kind of, you know, sometimes mill expansion or optimization kinda has to make up for, you know, what might be not meeting expectations in some other part of the mine plan. 10:57 And um, it's too ear- I think it's probably too early to tell that just yet given- Yeah... how ear- how, how early days things are. 11:03 And the other thing in the back of my mind is like they might be selling off because look at their ramp up here, Bellevue. 11:09 They just blank, lied to the market about not raising and then come out with a mill expansion story to raise off. Um, and potentially the market could be pricing in a similar st- similar thing here, though. 11:20 They're kind of, you know... 11:21 Okay, what if, what if they, what if they have to come back to the market to chuck in extra CapEx for the mill, um, to, you know, maybe, maybe there's some capital associated with the, the, the TSF that needs to happen. 11:31 Maybe there's a delay in production as a result of that. Maybe there's some, you know- Mm... more time that needs to be bought. 11:35 Maybe there's some balance sheet kind of implications 'cause of the debt too, and maybe the, the market's kind of pricing in a bit longer to play out before- Mm... 11:42 you can actually have the, you know, the rosy production profile that you were sort of banking on beforehand. Well, we don't, uh, harp on about ramp-up risks for no reason because you can just see that so... 11:53 It is like freaking hard, and the percentage of success rate of a, what would say we've had a brilliant ramp-up of our operation, which is a freaking complex thing to do, is so rare and that's why you- So rare... 12:08 that's why-Your mark clerks get rated- Yeah... like they do. 'Cause when they do execute- Yeah... a complex thing, is it's in the lower percentile of- Mm-hmm... success rates. 12:21 So- It's also why- You don't harp on about it for no reason. Totally. And it's als- I think it's also why, like, um, it can be a bit better for everyone sometimes when the ramp up actually happens. 12:31 Like, it's a, it's a ramp up of a mine that's in the portfolio of a bigger company that has other operations because then, you know, w- when you- when cashflow gets dire, it doesn't have a h- a, a hit on the capital structure of the company. 12:43 You don't have to dilute and all that sort of stuff. Yeah. But there's upside if you bloody nail it perfectly, like, you know, Capricorn or whatever too. Yeah. 12:48 There's [clears throat] plenty of, plenty of risks to, to look out for and, you know, we're gonna be watching them closely. 12:54 I think one or, or two other comments to kind of add to that is, you know, you gotta look at this in the context of base metal prices. 13:01 And the map down in 35% maps very closely to when base metal prices topped out in, in late May as well. 13:09 Silver has come off, zinc has come off, lead has come off, copper has come off, you know, since then, so that doesn't obviously bode well, but that was part of the reason why they'd run up and why they were able to raise capital at a, at a, at a very decent price two or three months ago as well, so. 13:25 Silver was the next big thing. It was. She was flying, mate. For a brief moment there. [laughs] And yeah, well- So is that, has silver pulled off more than gold? [tsks] Uh, silver in- Pulled, pulled back, sorry. 13:36 Well, silver was over 32 US dollars an ounce in, in May, and now it's sort of 28. Okay. So that's a 15%- Yeah, it is... percent pullback. Yeah Which is, you know, when you- A lot more than gold's. 13:48 Gold's still sitting at around that 24. Yeah. Go- Yeah... gold's steady. And one other thing just, just worth mentioning that I did notice two weeks ago, L1 increased their stakes. 13:57 They went from 7% to, to 9% shareholders. Yeah. Yeah, and, and that's, that's intriguing, right? Like L1, they, like, yeah, they, they're typically pretty good investors as well. 14:08 But so that's why it's so intriguing to me because, because if Adriatic have a good grip on the challenges and things are improving and the TSF is resolvable, um, 14:19 like this ramp up could look like the ramp up of Red 5, where you, you have your hiccups and, and then things hum. Um, you know. 14:27 But if any of the risks we talk about aren't resolvable or take longer or get bigger, then the sell-off is justified and things could get worse before they get better too. So it's just, it's such a r- like, you know... 14:37 The, the risk profile, like I was saying to JD, it's, it's like f- for my risk profile, it's, you know, it's bloody, it's too, too risky for me. 14:44 But I, I could e- easily just respect someone who took the opposite view, like, you know, in L1 and think, you know, "Heck, I reckon I've got, I've got it on the way up here from here and the rest is resolvable." 14:55 It just, it's too hard for me to determine- Yeah... that. Yeah. 14:57 It'd be funny how ramp ups and disclosure and, um, they wouldn't need to disclose, but how ramp ups would go and strategies would change if the companies were private and you didn't have to have the sh- [laughs]... 15:10 deal with the share market. You just went about it and you did the, did it the easiest way possible, uh, without having to frigging deal with the stock market thinking, "Oh, are you ra..." Yeah. 15:19 It, things would be different. Yeah. And, and then I didn't write this one up, but yeah, I think it's worth just throwing in a comment about Liontown as well. 15:26 So, you know, they're a bit behind the, um, the, the, the schedule of Adriatic, but they've just had first, first production, right? Mm. Um, now talk about short interest. 15:36 Their short interest I think is up to like 11.5%. Yeah. When I looked at Spark. And so they're, you know, they're, um... 15:43 That, and they're f- they're kind of, you know, bringing production online in, you know, the bloody, the, the worst possible pricing environment- Yeah... in, in some respects. So again, um, one to watch out. 15:54 They're, they're, they're, if they have like, you know, a- any of the bloody, the hurdles that, unexpected hurdles that were thrown at, at, uh, Adriatic while commissioning, this, they're super fragile as well in, in some respects. 16:06 So it's just a, it's a really vulnerable period for these single asset, uh, companies that are, you know, trying to bring online, um, good mines. Yeah. Yeah. God, I don't envy that. 16:17 That's gonna be, that's gonna be a very interesting one to follow. The first whole of ore flo- Yeah... whole ore flotation project at 3 million ton per annum, uh, as you said, in a depressed lithium pricing environment. 16:28 Yeah. Uh, yeah. But glad they've had first production on schedule, like that's positive for them. Yeah. 16:32 But, I mean, hopefully, um, yeah, hopefully they can fine-tune things, ramp things and everything like that and, um, hopefully their, you know, their, their unit costs can still kind of weather the cycle. Mm. 16:42 God, be- God, imagine all the shit that went in to get that first bit of spod powder. [laughs] Fucking hell. For that, just the whole mill, the bloody infrastructure required. Holy snapping duck shit. Yes. Uh, right. Uh, 16:56 Alto, Brightstar. Synergies. [laughs] So they're both in trading halt. Is that what... Wasn't the AFR that they're merging, these two? Yeah, no, it did come out of the- Yeah... 17:05 AFR, but you can deduce from both being in trading halts that, uh, that is a deal coming. So deal details yet to come out. So you can, 17:17 we can confirm based on the, uh, announcements that Brightstar are conducting a capital raise 17:24 on their end and a potential change of control and change of control transaction for Alto upon completion of that is conditional. 17:32 So there's a bit- So they're buying, they're buying, they're basically buying Alto with scrip- So it appears Brightstar are gonna be buying Alto- And raising all the scrip... looks like an all scrip deal. Yeah. 17:40 And probably raising some dosh as well. So it's interesting the dosh, if they're getting Alto all scrip, if they're, if it's all scrip, I think, which is what AFR said, what the capital raise is for. Oh. 17:55 So whether there's another element to it or not. Oh. You're constantly come raising, yeah. Yeah. It might, might just do a capital raise a- as well, or whether that- Just kill it... 18:03 capital's being used for a third part of the deal. I'm not- Oh, you think they could be buying something else? Well, I'm not sure. That's what I'm- Mm... gonna throw around. Okay. Not sure. 18:12 So, uh, and this might actually mean that-Out the Sandstone project for Alto might actually do something. [laughs] Or they might actually do some step out drilling and start drilling deeper and fucking hook into it. 18:27 [laughs] Uh, which would be pretty impressive. So- What are you trying to say, Matty? Um. [laughs] I've s- I've said enough. 18:33 [laughs] Um, 'cause getting Alto by itself doesn't change too much at this stage other than removing corporate costs and maybe, as I said, start pumping some money into drilling. 18:44 And, 'cause it's been sitting idle for ages just waiting to be bought. So- Alto? Yeah. I don't know if it's w- waiting to be bought or it's been hard to do a deal. Because there's, they've- Yeah... 18:55 faced a lot of corporate, like, interest historically. Mm. Like, there's Gold Sea tried to acquire them. You had, um, Adaman tried to acquire them. Middle, Middle Island- Middle Island... tried to get a deal done. 19:05 I think there are different ways of saying the same thing though. 19:07 Um, I reckon I've heard word on the decline, you know, a few more established larger gold companies submit MBIOs and kind of get, get nowhere in the process too. So, um, heck, now, now a deal's gonna be announced. Yeah. 19:20 Yeah. So qu- yeah. Well, good in... Yeah, got another comment on that. Um. [laughs] So who's in the r- let's go who's in the region, what might be happening? 'Cause I, I think there might... 19:30 I don't know if there's another part to this or not. So you got obviously Horizon Gold and Oramin. Uh, and you got Gateway just- All in Sandstone... next, next door to Sandstone. 19:41 I think they got half a million ounces as well. None of them in, are in trade and hold, so I don't know if they're involved at this stage. 'Cause Oramin, they've got that, they got that off Middle... 19:51 That was Middle Island. Yeah. Yeah. So that, they've a- they've got the old 550,000 ton processing plant that needs refurbishment. That's- There's- Can't be refurbed- Yeah... in my opinion. Yeah. 20:00 She's- That thing is scrap metal... pretty just bloody knock it down, start again. Uh, then Horizon Gold, remember, which is majoritely, majority Zeta. 20:08 They, 'cause they snatched up the $3 million stake in Alto last year from West Gold. West Gold. Yeah. That was the 9.9%. I think it's been diluted a bit since then. Yep. 20:17 Then they borrowed the money from Zeta- Their largest shareholder... to get that stake. [laughs] Yeah. Who owns 75% of Horizon Gold. And they've got that old Gidji Mill. I think that's only- Oh... 600,000 ton per annum. 20:29 Okay. Um- I didn't know they had a mill. Yeah Yeah, the Gidji, that's a part of that. I think that's needs, that's old. Needs refurb too. Not, yeah. Yeah. 20:35 'Cause that whole, that whole Ze- o- I re-listened to my pointless history on the Sandstone last year. Fuck, I told you it'd come in handy. 20:43 [laughs] Because I forgot that Ze- the whole Zeta stake come out of Panoramic- Yeah... 'cause Panoramic spun out Horizon Gold. Yeah. And then Zeta bought the remainder of the stake from Pan- Panoramic. Mm. Love history. 20:53 Um, yeah, Kirkalock is the other one. So that's the, that's in admin from the Ad- the whole Adaman thing. Yeah. 21:00 'Cause that, and that, that's 212 Ks away from Sandstone, and that's, but that's a two and a half million ton per annum mill. So that's actually got a bit of size about it. Mm. 21:08 So that'd be probably the preference 'cause it's got that, it's got... But it's, if you're gonna be feeding open pits into it. Yeah. 21:14 I haven't heard an update about that in so long, and it's like it'd be the world's longest admin process if it was still- Mm... in admin. 'Cause there's all the- There must have been some-... 21:22 whole rivet bloody- Oh, it's a bloody-... thing, isn't it?... circle of life. The, you know, you... Yeah, every, all the mining contractors also own the mine. Yeah. So it was a bloody... That'd be a tricky one. Yeah. 21:31 Um, 'cause at, well Agnew's the, that's probably the closest decent size, but you know. Yeah. There's no hope dealing with... I don't think Goldfields would be a toll treating option. Uh, not sure. 21:42 But that's, that's pretty close 'cause that's just up the road before Lenstar. Wiluna, that's 180 Ks away along the Sandstone road, and then that's actually pretty close to, uh, Horizon Gold's stuff. Really? Yeah. Yeah. 21:55 Yeah. So if you go, there's a- Wow... a road that- Yeah... yeah, Sandstone straight up to Wiluna. I don't, I don't know- What's the, what's the trucking distance? 22:02 Hundred and, I think I got it here, 170, 107, hundred, about 180. Gotcha. From Sandstone- Yeah... all the way up to Wiluna. So yeah. You're getting on the, the, the upper bounds of trucking distance. Yeah. 22:14 Even in grades two, twos. But there- Or twos, yeah. I don't know. It's, depends how you look at that versus the cash, the MPV of bloody spending the CapEx on a new mill, I guess. 22:24 Well, I always, I always had the hunch that, you know, Alto- 'Cause that's 2.1 million ton, 3 million, so that's got a bit of size about it too. Yeah. 22:31 I always had the hunch that, um, Alto's, Alto could, you know, drill out and have a, a resource that could justify maybe potential standalone if you- Yeah... gotta be creative, but- Yeah... um, yeah. Mm, don't know. 22:46 Don't know. Uh, Darlow, that's another interesting one. How far is that? That's, that, 'cause that is on the top of the list. That is 228 Ks away. Yeah. Okay. From Sandstone. That's, but that's only 1 million ton. Yeah. 22:58 So it's a bit smaller. So, but it's... Depends if you're, you know, easier to expand a semi-big one than a real old shit one. 23:06 Or could you bloody move the mill, just, just bloody- Well, I think you can move mills these days. Yeah. I think. Maybe do that. Move a bit of it. Yeah. Move some of it. [laughs] Yeah. Right? I think, who was telling me? 23:16 Someone said you could, what was it? You could move a mill for bloody 40 million or 10 or 40 million or something. 10 or 40. [laughs] 10 or 40. Some- It's all- [laughs] In that, in that realm. I imagine it's moodled. 23:28 I'm, I'm not convinced. I imagine it depends on a lot of factors. [laughs] Yeah, the size, but something around between 10 and 40. So, uh, yeah. 23:34 So that, 'cause that's obviously sitting idle in Red Five now, but that's- Well, Matty, the, the real question is, we've been speaking for, for over a year now about consolidation in Leonora and consolidation in, you know, the Murchison and whatever that... 23:46 But this is, you know, kind of a, a crossover of, of both in a way. It's a bit- Yeah Sandstone was its own kind of h- hub briefly- Yeah... for... I don't think it's ever been a knockout hub, mind you. 23:58 Troy Resources kind of, uh, you know, had, had the consolidated Sandstone for- Had-... for a while back How'd they go? Yeah, not very well, mate. [laughs] Not very well. 24:06 Well, but there's, there's a lot of- That's a moment, like. [laughs] But there's, uh, and there's... Yeah. 'Cause you got Red. 24:11 There's all the connections, that labyrinth picking up Vivian, which is right on that road as well- Mm... which is right next to near Agnew. Yeah. And they were trucking that. 24:20 So that's in the play, and so that's, but that's close to, uh, Red FiveDarlow But that's got a bit of a- As well. 24:27 And then, and then Genesis are obviously shareholders in Labyrinth Labyrinth And then there's the whole potential Genesis Red 5 thing coming together. So there's... Yeah, it's a lot. 24:39 There's, there's a heap of pa- whether people are trying to get in first, get ahead, and how that like... I know you say Sandstone's separate to Leonora and all that, but it, like, it might all come together. Who knows? 24:51 'Cause remember Brightstar, who are getting this now, have got the Menzies stuff right near Genesis's, uh, Gwalia and all the Lavedan stuff near their Mount Morgans. So there's a, there's fricking overlaps everywhere. 25:06 Yeah. So keep me bloody on. The, the [laughs] this whole, this Sandstone thing has got... I've got a double turnkey solution. Tell me. MMS and Silverstone, 'cause they, they're all turnkey. 25:20 They're turnkey together already. Yeah. Mining, power. I've got double turn. I've got turn, turn, like pretty much a U-turnkey. Ru- run me through the keys. 25:32 So, well, the only way to start open pits pretty much in WA now is with MMS. Yep. Zero barrier to entry. They pretty much free carried bloody to start it, and then you just pay them back later. 25:44 It's the pretty much the best bloody arrangement ever. They take on the risk. Take on the risk. Gurus at moving rock. 25:50 Then you've got Silverstone to wa- sort out any bloody water infrastructure, surveying, power solutions, people for the mines, the mills. Bloody Brightstar, if you're listening, like 26:03 I'm, I'm hoping they've made the call already. I would not wanna be getting them to do it. Like I, I'm probably tempted to call up MMS and Silverstone myself. 26:13 So look, if you, if you couple all that together, like a- we've turned two separate turnkeys into just a mammoth of a fricking mining solution to get this Sandstone going. 26:23 I think the future of Sandstone is gonna be hinging on MMS and Silverstone's involvement. So, uh, mate, there... Is there anything that those two companies can't do together? I think- Yeah, it's a good point, mate. 26:36 So to... Yeah. I think maybe the S of MMS will be Silverstone. Like it could turn into Mineral Mining Silverstone. Mm. Like [laughs] that... 26:45 Th- this could be a super merger, but I- Brightstar wants to be a miner and not just a de- a dealer then. Yeah. Yeah. You gotta engage these- Yeah... professionals- Yeah... into it. 26:54 So bloody, mate, I can see that happening. Um- I look forward to it, Matty. Yeah. And we've got... Look, we've got other partners that can go drill the holes too. Fucking heck. We are offering everything. 27:05 We are the turnkey. I'm hoping that, uh, tomorrow we'll have a bit more info on what's actually going on here- Sure... after me just making up my own ideas about it, but it could be interesting. JD, champion on. 27:18 One more story to talk about. So these are an, an iron ore miner out in Canada, $3 billion business. They are one of the, you know, one of the biggest success stories in, in our industry over almost the last decade. 27:31 Really from the, the depths of the, the iron ore lows in sort of 2016 is when these guys got on a, on a hell of a run. 27:38 So the, the quarter that's just been, they did 3.8 million dry metric tons in production and sold 3.4 million tons, and like I think I said earlier, it's, it's a high grade product that they're selling, 66.3% iron concentrate, and that 3.4 million tons was a, a record for them. 27:56 So they're, they're heading in the right direction. They sell this at a net price of US 99 bucks. 28:03 Now, their, their gross selling price is sort of marked against the P65 index, and it was actually a, a little disappointing. So P65 obviously implies 65%. 28:15 They have a slightly better quality product than that, so you'd expect them to get a bit of a, a premium on that index, but that wasn't the case this, this time round. 28:23 So that's kind of disappointing to see, and it's, it's not a point that should be glossed over too much because receiving a, a premium price is pretty core to the, the investment rationale at, at Champion Iron. 28:38 And these, these various indexes you see in iron ore pricing, pricing, that they're relatively nascent, especially on that sort of premium end. 28:46 Like I said, I think they're gonna be a bigger and bigger deal into the future, but they're nowhere near as sort of, you know, well referenced as the, the P62 and the, the 58%- Yeah... quality products out there. 28:58 But that, that's one to watch 'cause you wanna see in future... You know, I couldn't, I couldn't help but think of our conversation with Rusty. You as the company wanna inform the market. 29:07 You wanna get paid for your better quality products, so that, that's a sort of journey that needs to happen, and you know, no doubt they'll be wanting to do that 'cause it's the, where they- It's prima. 29:19 Yeah, exactly, where you get your money from and you wanna be paid for, for what you produce, especially if it's a, a higher end sort of product. 29:25 On the other side, C1 costs of US 77, so obviously we're not talking about a, a BHB or an FMG. You know, the scale is nothing like what those guys do. But costs are heading in the right direction. 29:36 C1 was down 5%, although your all in sustaining cost ticked up, and there's a bit of seasonality to this out in Canada. 29:43 When, when the weather is a bit better, you can do tailings lifts, you can do a few more rebuilds when it's not, y- you know, completely frozen over up there in, in the far north. Wh- which is... 29:55 Which, um, province is it in? On the south, south end of the Labrador Trough, approximately- Oh, it is Labrador... 13 kilometers north of Vermont, Quebec. Lab... 30:04 'Cause Rio's got the iron ore in Labrador they got out of north, eh? I believe so. Yeah, mate. Yeah. Fucking Rio. Rio could be a takeover target. Yeah. 30:13 [laughs] So w- when you, when you break it down how this business did this quarter, they produce at 90 buck, $92 Aussie. They sell it at Aussie 136, so that's a $44 margin. 30:25 You sell 3.4 million tons of that and you generate 150 million.So not so bad for- Just a boutique operation... 30:31 yeah, not, not-- I mean, yeah, you compare it to all the other companies we talk about, and that's a pretty, pretty standout kind of quarter of, of production, 150 million there. So strong production for the quarter, 30:44 but like I said, sales were a bit below the actual production, so you can, you can think of a bit of bottleneck there. You want your sales to be right up at what you're producing. 30:52 So they've got, you know, three-ish million tons in stockpiles there, and they're kind of addressing this. They need to buy more rail carts. They need to get it going. 31:00 And unlike the iron ore operators up in the Pilbara, they don't own the whole railway up there, so they need smooth integration with the railway operators there. 31:09 They need to get more carts so they can, you know, wind down those stockpiles a little bit and get the, um, the sales really matching the, the production. How's the cash, JD? 31:18 So they've got a bit under 300 million bucks right now with a $500 million, you know, credit facility there. They've sunk $154 million in to date into their DRPF project. 31:31 Now, this is gonna upgrade half of Bloom Lake's capacity to DR quality pellet feed. 31:37 Now, that grades 69%, and the-- essentially the, the quality, it's a, a high quality product there, which means you don't require blast furnaces in the steelmaking product, and again, sort of bodes in with that being able to get a, a better price for it. 31:51 It's all going on budget, on schedule to come online in the second half of next calendar year, $470 million, so they've spent about a third of it. 31:59 So when you kind of think about the cash that they've got, it's, it's handy that they've got that credit facility there to sort of see them through without, without any hitches. 32:08 Now, you guys might have also seen there was, um, some pretty bad fires up there in Canada this, this month actually, and Champion, along with a few other operators, had to flick off the operations. 32:19 So these guys had downtime for about three days, but they're, um, they're back on- online now. 32:25 There was one other aspect that I f- that I found particularly interesting, and we kind of touched on it in our coal conversation with Matty Water not too long ago, but Canada recently put high purity iron ore onto their critical minerals list. 32:37 Now- Ooh... these critical minerals lists can, you know, kind of take them with a pinch of salt. I'm not sure how seriously to take them. There is this one aspect that's really solid. 32:48 If you can unlock government funding because you're on that list, then that's a huge benefit. So that might come in down the track when Champion can get it for their development project out in Labrador. 32:58 If they can get cheaper financing for it because it's on the critical minerals list, then, you know, good for them. 33:03 But it kind of makes you, you think about the conversation we had, and understanding that high quality iron ore is just one ingredient in the steelmaking process. 33:13 Canada has met coal, and they have decent met coal projects. 33:16 Is it too political for us to sort of say in future are they gonna put some of these higher quality projects with met coal on that critical minerals list as well? I don't know. 33:25 I c- I certainly can't see it happening with the, the current progressive regime you see up there in Canada, 33:30 but maybe in time it's a way of prioritizing better projects over, you know, more emissions intensive projects and meaning better quality product comes out of the ground, so you, you get to the goal that sort of society moves to in time. 33:44 Oh, imagine, imagine a vertically integrated iron ore producer with the bloody iron ore, the met coal- Steelmaker... by a bloody smelter, vertically integrated. We should start that. That stuff- Let's get a shell... 33:58 used to exist. Yeah. But a huge part of what, like, you know, the likes of BHP have done over their journey is remove all the downstream- Mm... 34:05 from, from their business because, you know, you have a specialization and an upstream line. Think about when BlueScope- Is that when they moved out to New S- the Newcastle steel making? Is that when BHP had it? 34:14 So Bl- I mean, Blue S- BlueScope was spun out of BHP. They were the steelmaking unit in- Yep... in Australia, and what you sort of learn over time is that you get really good at one thing. 34:24 You can do that really well, and you can- Yeah... move away from it. It's a different set of risks. It's not as simple as, like, you capture the margin by kind of, you know, having it all. Yeah. I tell why you do it. 34:34 We'll do it better, mate. Yeah. Give me some. Seed. [laughs] Good stuff, boys. Uh, pack, we've got a bloody... got a, got one in bloody, what, 20 minutes. Mate, good time. We're all go. 34:47 We're bloody getting more efficient. Twen- that was 40. No, like 20 minutes time- Oh, stand... we've got another one. Yeah. Fucking. We've got Barn Meis to get, fellas. Yeah, right. Let's go. Bloody, uh, I'll, I might... 34:57 I'm gonna shout all these companies a Barn Me. Axis Mining Technology, I'll drop that off. Mineral Mining Services and Silverstone powering the sandstone. 35:06 You've also got Verify, Get Wet Solutions, DSI Underground, CRA Insurance, WA Water Boards, K-Drill, and You Spark while you're at it. You Spark. Imagine if we changed Silverstone to Sandstone. 35:17 That might happen after this. That's one for the future, mate. Hooteroo. 35:20 [laughs] The information contained in this episode of Money of Mine is of general nature only and does not take into account the objectives, financial situation, or needs of any particular person. 35:30 Before making any investment decision, you should consult with your financial advisor and consider how appropriate the advice is to your objectives, financial situation, and needs.